Repair Burnt out TNB cable and cut-off fuse
Repair Burnt out TNB cable and  cut-off fuse  burned wiring on meter panel or short-circuits 在仪表板上烧坏接线或短路 Troubleshoot & Repair 排查和维修 Kuala Lumpur (KL), Selangor, Malaysia Services, Contractor | Yi Ann Electrical Engineering

Burnt Cable and Cut-Off Fuse Fault Assessment in Kuala Lumpur

Yi Ann Electrical Engineering (奕安电器工程), based in Kuala Lumpur, lists repair work involving burnt cable and a cut-off fuse near the electricity meter panel. The affected equipment and ownership boundary must be assessed before defining the work that can be carried out.

Request an assessment

Contact +6012-290 5241 with your location, photographs and requirements to discuss the scope of work and quotation. Final recommendations depend on the existing installation and site assessment.

Frequently Asked Questions

Does this listing mean the contractor is authorised by TNB?
No such authorisation is stated here. Confirm the permitted scope of work and whether electricity supplier involvement is required.

Can burnt cable be repaired without checking the cause?
The cause and extent of damage must be assessed before selecting replacement components or repairs.

What should I do if the meter area is damaged?
Keep away from damaged equipment and seek professional assistance. Supply-side equipment may require the electricity supplier’s attention.

Please leave your enquiry here, we will reply as soon as possible.


*only support gif, jpeg, jpg, png, pdf
Switch To Desktop Version